Pakistan's investment in energy with private participation (current US$) was US$100 million in 2022, the latest year in the World Bank's World Development Indicators. That is down 92.86% from US$1.4 billion in 2012 (23.2% a year on average, compounded).
Key figures
| Value | Year | |
|---|---|---|
| Latest | US$100 million | 2022 |
| Five years earlier | US$6.1 billion | 2017 |
| Ten years earlier | US$1.4 billion | 2012 |
| Highest | US$6.1 billion | 2017 |
| Lowest | US$6.7 million | 1992 |
| Average since 2013 | US$1.72 billion | 2013–2022 |
| First recorded | US$6.7 million |
What the numbers say
In 2022, Pakistan's investment in energy with private participation (current US$) fell 60% on 2021 (from US$250 million to US$100 million).
Across the 18 yearly changes before that (1995 to 2021), the average change was +211.4% and a typical year strayed about 696.3% from that (the standard deviation). This year's change was 0.4 standard deviations below that average, so it was an ordinary year: it sits within the range of normal year-to-year movement.
On record, the biggest yearly rise was 2,935.6% in 2005 and the biggest yearly fall was 93.5% in 1997. The numbers show how large and when, not why; for the cause, look at what happened in that country in those years.
From 2013 to 2022 there is no clear straight-line trend: a straight line explains 1% of the movement over 9 observed years, so the value is moving around more than it is heading anywhere.
Worked out from the yearly values above. How the checks work: standard deviation, z-scores and straight-line trends.
How it compares
See how every economy compares in the full ranking.
| Value | Year | |
|---|---|---|
| Pakistan | US$100 million | 2022 |
| Lower middle income | US$7.89 billion | 2024 |
Closest to Pakistan in the 2022 ranking
- Nepal — 1st of 4: US$858.74 million
- Morocco — 2nd of 4: US$167.92 million
- El Salvador — 4th of 4: US$25.3 million
What this measures
The Private Participation in Infrastructure (PPI) Database records contractual arrangements for public infrastructure projects in low- and middle-income countries (as classified by the World Bank) that have reached financial closure, in which private parties assume operating risk. Investment in energy projects with private participation refers to commitments to infrastructure projects in energy (electricity and natural gas: generation, transmission and distribution) that have reached financial closure and directly or indirectly serve the public. The types of projects included are management and lease contracts, brownfield projects, greenfield projects (in which a private entity or a public-private joint venture builds and operates a new facility), and divestitures. Investments are classified as one of two types: (1) Investments in physical assets: resources the project company commits to invest in expanding and modernizing facilities and (2) payments to the government: to acquire state-owned enterprises or rights to provide services in a specific area or to use radio spectrum. Data is presented based on investment year. Data are in current U.S. dollars.
Limitations: The data on investment in infrastructure projects with private participation refer to all investment (public and private) in projects in which a private company assumes operating risk during the operating period or development and operating risk during the contract period. Investment refers to commitments not disbursements. Foreign state-owned companies are considered private entities for the purposes of this measure. Investment commitments are the sum of investments in physical assets and payments to the government.
Regional and income-group figures are computed by the World Bank as a sum.
All 23 values
| Year | Investment in energy with private participation (current US$) |
|---|---|
| 2022 | 100,000,000 |
| 2021 | 250,000,000 |
| 2020 | 1,951,750,000 |
| 2019 | 2,976,610,000 |
| 2018 | 1,182,200,000 |
| 2017 | 6,097,650,000 |
| 2016 | 1,688,400,000 |
| 2015 | 883,340,000 |
| 2014 | no data |
| 2013 | 350,100,000 |
Investment in energy with private participation (current US$) in nearby economies
- Egypt, Arab Rep. — US$173.3 million (2024)
- Jordan — US$74 million (2019)
- Morocco — US$167.92 million (2022)
More private sector & trade data for Pakistan
- Merchandise trade (% of GDP) — 23.67% (2025)
- Merchandise imports (current US$) — US$65.85 billion (2025)
- Merchandise exports (current US$) — US$30.55 billion (2025)
- Merchandise imports from economies in the Arab World (% of total merchandise imports) — 32.96% (2023)
- Merchandise imports from high-income economies (% of total merchandise imports) — 52.91% (2023)
- Merchandise imports from low- and middle-income economies outside region (% of total merchandise imports) — 44.92% (2023)
- Merchandise imports from low- and middle-income economies in East Asia & Pacific (% of total merchandise imports) — 34.71% (2023)
Reading data like this
Questions people ask
- What is Pakistan's investment in energy with private participation (current US$)?
- US$100 million in 2022, according to the World Bank (World Development Indicators).
- How has it changed since 1992?
- It is up 1,393% from US$6.7 million in 1992 (9.43% a year on average, compounded). The highest value was US$6.1 billion in 2017 and the lowest US$6.7 million in 1992.
- Is the latest change in investment in energy with private participation (current US$) unusual for Pakistan?
- In 2022, Pakistan's investment in energy with private participation (current US$) fell 60% on 2021 (from US$250 million to US$100 million). Across the 18 yearly changes before that (1995 to 2021), the average change was +211.4% and a typical year strayed about 696.3% from that (the standard deviation). This year's change was 0.4 standard deviations below that average, so it was an ordinary year: it sits within the range of normal year-to-year movement.
Source
World Bank, World Development Indicators, indicator IE.PPI.ENGY.CD, licensed CC BY 4.0. Original source: Private Participation in Infrastructure Project Database, World Bank (WB), uri: https://ppi.worldbank.org/en/ppidata Figures are fetched from the World Bank API and refreshed monthly; see the series on data.worldbank.org. The full definition and method are in the World Bank's metadata glossary. Comparisons use the same World Bank release.
Want to ask your own questions of data like this? Try AnalyzeIt: upload a file or ask about public data in plain words, and every figure comes with its working.
Legal entity
Devansh Yadav
Moradabad, Uttar Pradesh
Governing law: Courts at Moradabad, Uttar Pradesh
Phone: +91 8433475698
Legal: legal@analyzeit.in